KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-2-2023
Number of Hours:  3.00
Manual Reference:  15-02
Brief Description:  Rudder hardware clickbonds

Remove port rudder hardware, make some changes and use the same brackets to install the starboard rudder hardware clickbonds.

Tape up the port clickbond threads and slap on 2 x BID reinforcement. (I think 1 x BID would have been enough). Peel ply over. I was going to bolt on the left rudder hardware to hold it flat, but I don't have enough non-aviation nuts. Push some taped mudguard washers over the result, and keep them flat as they cure.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.