KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  3-12-2022
Number of Hours:  1.60
Manual Reference:  25-03
Brief Description:  Elevator bottom re-finishing. Air vent inlets

Over the last couple of days profile sanded the elevator bottom repairs, then re-wiped with 4 coats of epoxy. Started wet sanding, but have run out of 220g and used 360g which took ages. Left the final until I have 400g on hand.

Started sanding the NACA air vent inlets and surrounds, but can't find the form I made to get the shape right. Spend most of a day cleaning the shed, (my usual method for finding something misplaced, but it doesn't work today).

Port elevator still looks a bit dodgy, so sanded it back a bit and refilled.
' style=

Finish sanding before re-wiping

Finish sanding before re-wiping

' style=

Finish sanding

Finish sanding

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.