KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  11-14-2021
Number of Hours:  1.80
Manual Reference:  25-03
Brief Description:  Profiling fill canopy frame and canard

Previous work on the canard, canopy frame, nose and canard cover fill and profiling was hidden away in the individual chapters, where some of it belonged. From now on it will all be here in 'Finishing'.

Checked my work on the port canard bottom with templates and a straight edge. Looks good.

Used the same sanding technique with the top of the canopy frame/turtleback. ie. fair with a 40g long board/ fine work with 80g medium board/detail work with 80g sandpaper in hand and on various shaped sanding blocks.
' style=

Mmmmmm. Flat as a night-carter's hat

Mmmmmm. Flat as a night-carter's hat

' style=

Sandy, sandy

Sandy, sandy

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.