KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  9-2-2021
Number of Hours:  2.30
Manual Reference:  18-14CC
Brief Description:  Canopy frame edge and drip rail take #2

In through the windows, and layed up the inside canopy drip rail. 1 x BID, then 1 x UND longitudinally along the edge of the frame, then 1 x BID overall. Peel plied edges.

Layed up the canopy frame edge, overlapping over the longerons. 6 x UND at 90 degrees to each ply, both at 45 degrees from the frame edge. Peel plied edges and joins.
' style=

Peel plying the edges

Peel plying the edges

' style=

Home-made ortho BID tapes along edges

Home-made ortho BID tapes along edges

' style=

Finishing off

Finishing off

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.