Brief Description: Canopy frame edge and drip rail take #2
In through the windows, and layed up the inside canopy drip rail. 1 x BID, then 1 x UND longitudinally along the edge of the frame, then 1 x BID overall. Peel plied edges.
Layed up the canopy frame edge, overlapping over the longerons. 6 x UND at 90 degrees to each ply, both at 45 degrees from the frame edge. Peel plied edges and joins.