KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  3-19-2021
Number of Hours:  4.70
Manual Reference:  25-01
Brief Description:  Finishing 101 - aileron, windows & gear legs

More of the same.

Had a bash at filling the gear legs. I had extended the under side in a reasonable airfoil, leaving it to be faired at the top. This I did with a curved scraper, loading dry fill to an airfoil shape. I filled them roughly, then after a 2 hour break had another go, and then another. Looks lovely. Left a gap at the trailing edge so the cover will have glass-to-glass, then 1 x BID overlapping 1" onto the gear leg, using MGS fast.

After first attempt at Cory Birding the remaining aileron found a low spot. Refilled and started the process again.
' style=

More framing

More framing

' style=

Filling gear leg

Filling gear leg

' style=

Covering the fill

Covering the fill

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.