KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  10-25-2020
Number of Hours:  1.30
Manual Reference:  16-03
Brief Description:  Forward control bearings

Refitted with flight hardware and it all looks good. Retrieve some more flight hardware and hook up the elevator pushrods. With the elevator cross tube currently installed this means the sticks go backwards and forwards together for the first time. And I climb into the airplane to experience this. Giddy with enjoyment I fit the aileron cross tube as well so the sticks move together laterally as well. Wot fun!

Drunk with excitement I rivet up the starboard CS129, I think I was building up a head of steam to bung the wings on and waggle the ailerons and elevators at the same time, but putting one rivet in the wrong place made me calm down and walk away...
' style=

All fitted up

All fitted up

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.