KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  7-19-2020
Number of Hours:  4.00
Manual Reference:  21-06
Brief Description:  Fuel feed pipes

Spent some shop time re-installing my original epoxy hot box thermostat, and put the temperature probe next to the other one that reads out on the wall. They now agree to within 2 degrees C. They didn't before.

Pulled out my tubing cutter and bender and played with tubing for the fuel feeds. Bent up a form from welding rods, and bent up some pipe. Had to re-do one that I cut too short, I'll use that for the delivery. Bent up tubing for the feed from the side blisters to the sump tank and drilled all the holes oversize. Spent a lot of time trying to predict how they would come out, and decided just to give it a go. Worked.
' style=

Trying to convince myself I would rather cut bits of metal or drink tequila.

Trying to convince myself I would rather cut bits of metal or drink tequila.

' style=

Hang on, I don't even drink tequila

Hang on, I don't even drink tequila

' style=

Oh! Wait! I'm doing Dry July. no tequila for Spodman...

Oh! Wait! I'm doing Dry July. no tequila for Spodman...

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.