KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  6-2-2020
Number of Hours:  0.50
Manual Reference:  21-05
Brief Description:  Sight gauges and final internal fuel tank details

Pinned beanie through inlet tube, and floxed second cap onto starboard sight gauge.

Drilled and prepped port sight gauge tube and floxed the inlet tubes.

I've been using leftover resin to squeegee over the inside of the fuel tanks, and have now finished!

Floxed on port fuel drain hardpoint
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.