KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  5-3-2020
Number of Hours:  2.20
Manual Reference:  21-05
Brief Description:  Fuel sight gauges

Made a test piece to try out the method I intend. Sanded a groove into a bit of scrap wing foam and applied 2 x BID. Felt quite naughty not prepping the foam with micro, but I'm using Norglass resin. Clamped the BID with a bit of 25mm OD conduit.

Took a small section of schedule 40 PVC, Roughed up one end inside and out. Filled the cap of a packet of dremel exploding cutting discs with flox and bunged it on the end. This overfilled the tube, the next should have the cap about 2/3 filled to make it work properly.

I had made too much resin, so decided to evaluate the norglass resin for filling. Made up some really dry micro and spread it over a test patch inside the turtleback, using a 6mm notched spreader.
' style=

Test piece skin complet

Test piece skin complet

' style=

Test patch. Didn't use much micro really

Test patch. Didn't use much micro really

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.