KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  2-2-2020
Number of Hours:  3.50
Manual Reference:  18-09
Brief Description:  Turtleback inner taping

Squodged generous flox fillets everywhere it seemed reasonable.

2 x BID tapes over turtleback/longeron join, with another 2 x BID over my drip rail modifications. All wet out on the bench and transferred on peel ply.

8 x BID over engine mount reinforcements, extending over inner longerons and turtleback, wet out ply by ply in place.

2 x UND and 1 x BID overlapping repair of inside of forward turtleback.

Floxed over the assembly screw hole over C-8, but forgot the intended 1 x BID. Later dude.
' style=

Tapey, tapey

Tapey, tapey

' style=

Engine mount reinforcement

Engine mount reinforcement

' style=

Tapey, tapey

Tapey, tapey

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.