|
|
Home of the Spodplane
|
Date: 1-17-2020
|
Number of Hours: 3.30
|
Manual Reference: 18-08
|
Brief Description: Turtleback install
|
|
Trimmy, trimmy, all OK. Cut out the aft windows just for fun, with multitool and die grinder with sanding cones.
Taped aft of firewall to centersection spar, (layup #2).
In a change of pace, following a tip on the Cozy Builders forum, put 1 x ply of 4oz light fibreglass cloth over the spar and fuselage side inside the intended fuel tanks, with a wet coat of Aeropoxy, plus the 2 x BID tape over the joint and flox fairing.
|
|
Trimmy, trimmy
|
|
Layup #2 of the Spar install, one to go.
|
|
Getting the plane brown for fuel tanks
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |