|
|
|
|
Home of the Spodplane
|
Date: 1-12-2020
|
Number of Hours: 4.50
|
Manual Reference: 18-04
|
Brief Description: Turtleback outer skin prep
|
|
Spent a lot of time visualising canopy latches. Cut out a pair of C-2 from 0.032" 4130, which looked good, but I later note they need to be 0.050" if they are to match CS-124, so these are just for fun and giggles. Cut out a C-2 from plans 1/8" 2024 T3, and note these are noticably stiffer.
Cut out and prep EM-2 engine mount hardpoints. I only had enough 1/4" for one, so superglue together 2 bits of 1/8" for the other.
Plan a shorter catch bolt, -9, for the aft C-8, due to the thinner 0.050" 4130 C-2 and figure out a spacer to put the C-8 in the right spot.
Cut out interwall C-8 substitute from 1/8" 2024 T3, and prep. Cut mounting site into turtleback. Bend C-8 slightly to make bottom bit parallel to inner side of longerons.
No idea if required, but put 1 x UND fore/aft over C-8 site on inside of turtleback around the bottom of the flange, and overlap 1/2" for 2 x BID,
|
|
Finishing C-8 planning
|
|
Reinforcement over C-8 sites
|
|
|
|
|
|
|
|
|
Copyright © 2001-2024 Matronics. All Rights Reserved. |