KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-9-2020
Number of Hours:  4.50
Manual Reference:  18-04
Brief Description:  Turtleback outer skin prep

Finished profiling foam for window flanges.

Marked longeron positions for planned catches and considered. Still can't see how this is compatible with a steel rollover structure. Hmmmmmmm. Do some reading, and can't find any Cozy issues with rollover, those that have have survived, just from the fixed turtleback portion of the canopy. Mmmmmmmm. May abandon steel concept and just do the plans method.
' style=

Carving the windows

Carving the windows

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.