KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-2-2020
Number of Hours:  2.90
Manual Reference:  18-03
Brief Description:  Turtleback Bulkhead and cutline

Trimmed layup, all OK.

Fine trimmed the ends, flush with J1/5. Wish I had made the slats flush when I made the form.

Marked the center of the TB-1 on the Turtleback inside skin and directly marked up the TB-1 foam, (outer rim only until I make a decision on the rollover/headrests). Cut it out, with glass and peel ply and assembled core.

Marked cutline using plans method, but 1" aft due seatback mod, and drilled guide holes.

Started cutting up driprail foam.
' style=

Trimmy, trimmy

Trimmy, trimmy

' style=

TB-1 is go Virgil!

TB-1 is go Virgil!

' style=

Marky, marky

Marky, marky

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.