Powered By Kitlog Pro v2.0
Home of the Spodplane
Cozy IV
All
12-18-2019
< Previous Log Entry
Next Log Entry >
Date:
12-18-2019
Number of Hours:
0.50
Manual Reference:
13-11
Brief Description:
Elevator root fairings
Removed canard, dug out the modelling clay, rough trimmed fairings, whacked it back on and adjusted gap between fairings and elevators to at least 1/8" clearance and started flox corners inside fairings and elevator roots.
Trimmy, trimmy
Adjusting end gap
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy IV Home
Category
# Logs
# Hours
All
1058
2210
Casa del Spodd
4
2
CH04 - Fus Bulkheads
36
64
CH05 - Fus sides
17
53
CH06 - Fus Assembly
36
85
CH07 - Fus Exterior
29
56
CH08 - Fus Innards
19
36
CH09 - MLG
74
179
CH10 - Canard
56
115
CH11 - Elevators
38
58
CH12 - Fit Canard
12
19
CH13 - Nose
122
212
CH14 - Center Spar
53
117
CH15 - Firewall
1
1
CH16 - Controls
40
48
CH17 - Air Brake
6
8
CH18 - Canopy
35
106
CH19 - Wings
166
392
CH20 - Winglets
88
169
CH21 - Strakes
132
349
CH23 - Engine & Cowl
11
18
CH24 - Seats, Armres
64
102
Materials
6
4
Miscellaneous
2
5
Shop Supplies
1
6
TC reports
10
6
Copyright © 2001-2020 Matronics. All Rights Reserved.