Rudder Cove layup. Stood each Rudder in turn in the best of my two Rudder stands. Applied 3 x BID overall lapped onto internal Bellhorn both sides, leaving a gap for the hinge. Extra 2 x BID pads over hinge locations. All plies wet out on peel ply and transferred.