KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  2-7-2019
Number of Hours:  1.50
Manual Reference:  20-07
Brief Description:  Rudder Installation - Coves

Rudder Cove layup. Stood each Rudder in turn in the best of my two Rudder stands. Applied 3 x BID overall lapped onto internal Bellhorn both sides, leaving a gap for the hinge. Extra 2 x BID pads over hinge locations. All plies wet out on peel ply and transferred.
' style=

Cutting glass to match peel ply template

Cutting glass to match peel ply template

' style=

Stipple, stipple, and trim excess

Stipple, stipple, and trim excess

' style=

Next

Next

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.