3 x BID over Winglet cove, 2 x BID over hinge locations. Wet out on peel ply then transferred onto cove. Was very difficult to manage the vicinity of the Bellhorn pocket, so did in two sections on the second wing.
Very hot in the shed again and completely shagged so did not proceed with the Rudders.