KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  12-13-2018
Number of Hours:  2.00
Manual Reference:  
Brief Description:  TC report #3

"Checked upper and lower wing skins of both port and stbd wings.

Checked port and stbd winglet skins

All work has been performed to a very high standard

OK to fill and paint all fuselage, canard and wings.

Next inspection: After engine installation"

After a bit of thought I might ask him back before I close out the Strakes. We also discussed that it was not practical to see the structure of the Winglet/Wing join without about 4 inspections. He suggested I just clearly document each step in the process. Thanks for the kind words Len!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.