KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  7-27-2018
Number of Hours:  2.70
Manual Reference:  16-01
Brief Description:  Roll control installation

Started installing roll controls on the right side, same method as on the left. Is a never ending succession of marking where the holes need to go, pulling it apart, drilling on the drill press, reaming , bolting and re-installation for the next bit. Managed to dimple the firewall bushing without putting holes in it this time.
' style=

Starting

Starting

' style=

Gitten it done

Gitten it done

' style=

I'll put it HERE

I'll put it HERE

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.