Prepped foam, cleaned up and cut the small bits of glass, (big bits coming off the roll), and peel ply to install it.
Installed the schedule decided last time, doing the big bits onto peel ply and transferring to the Aileron cove, finishing up the ribs with scraps. Peel ply over the hinge sites
1 x BID over leading edge of left Aileron and peel ply transitions.
Micro, micro. Sorry about the visible undies...
3rd ply onto the peel ply
Boof the layup into the cove and dig out the peel ply, re-used for the Aileron layup