Prepped foam and removed micro blobs. slurry then 1 x BID over leading edge of Right Aileron. All long plies wet out on peel ply then transferred to the site.
2 x BID over Right Aileron cove, did end ribs with separate bits with a fair bit of overlap. Local buildup over outer hinge bit 1 x UND 1 x BID, outer and mid get 3 x BID.