KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  3-17-2016
Number of Hours:  1.00
Manual Reference:  13-05/09
Brief Description:  Ballast Compartment & pitot

Floxed pitot assembly to NG-31/nose.

2 x BID over all, overlapping 1" onto NG-31/nose bowl

Applied 2 x BID tapes over all NG-31/NG-32/nose bowl joins, leaving me with a scrap of BID smaller than a kid's hanky. Laid the tapes up over peel ply, then transferred them into place with a mixing stick. Worked well.

Didn't put on the nose for cure, as some tapes got in the way. Fingers crossed.
' style=

Floxing up the pitot

Floxing up the pitot

' style=

Taping, taping

Taping, taping

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.