KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  2-4-2016
Number of Hours:  1.30
Manual Reference:  13-11
Brief Description:  Reattach Nose top

Prepped all and refitted nose top with flox

1 x BID tape over and under. Plans say do over after cure for some reason. I did leave a bit untaped where the alignment tabs are.

Running a bit low on BID scraps now.
' style=

Floxing up the joins

Floxing up the joins

' style=

Taping up the join

Taping up the join

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.