KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-13-2016
Number of Hours:  1.00
Manual Reference:  13-08
Brief Description:  Nose gear doors

Set up doors on bench and routed channel for 1/8" fg rods (salvaged from dead kite) to retain the springs. Note half way through that if I had placed the spring over the ip slot in my bench I could have tested the spring operation. Oh well.

5 min rod and spring in place.
' style=

Fitting the spring

Fitting the spring

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.