KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  12-26-2015
Number of Hours:  2.30
Manual Reference:  13-10
Brief Description:  Nose lower skin layup

Taped off the fuselage, and the upper nose, then apply some dry micro to the bigger divots, and slurry to the foam.

Fair a curve aft of NG-5 and fore/aft of NG-3 with flox.

To minimise the need for peel-ply/exposed edges did the lower nose skin layup backwards from the plans.

1 x BID over the nose strut, overlapping 1" onto the foam, then 2 x BID overall, the last overlapping the previous by 1" on the sides. The last two overlap 1" onto F-0 and the rest of the fuselage.

Peel plied the edges and the side overlap, (needed a small overlap in the upper corner on the last layer).

The nose bumper was badly placed to be part of all this, so put on 1 x BID just on it.
' style=

Plasticine hasn't done anything odd yet

Plasticine hasn't done anything odd yet

' style=

Third layer

Third layer

' style=

Peel ply and done!

Peel ply and done!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.