KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  10-3-2015
Number of Hours:  2.00
Manual Reference:  Step 2 & 3
Brief Description:  Trial assembly NG-30

Trimmed layups, bolted NG-30 together and sanded to same profile.

Drilled/reamed MKNG-6 pivot out to 5/16".

Assembled NG-30 around MKNG-6 using AN5-50 bolt, which will require AN960-516L washers, which I don't have. Using the thin SS washers that come from the upper Noselift mount. To get the separation between NG-30 at the NG-51 location requires two AN970-5 wide area washers either side of the MKNG-6. This makes the spacing between NG-30 2.95" at the FWD end, (which has thicker plies), and 3" AFT.

Adjusted NG-14 to 2.5" length, and assembled Noselift into NG-51, separated by NG-14 in the bottom holes, where it shouldn't be :)

All seemed kosher.
' style=

Match sanding

Match sanding

' style=

Glimmers of understanding

Glimmers of understanding

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.