KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  9-24-2015
Number of Hours:  0.70
Manual Reference:  Step 1 & 2
Brief Description:  Nose Strut wrap and NG-30

Trimmed NG-30 some more and sanded sides flat. Layup is still a bit gummy, it is really cold here.

Marked out hardpoint cutouts, the wheel bearing spacers that came with the wheels are just the right size. Is hard to be certain, but believe I have the locations right for the EZ-Nose Lift, as compared to the plans manual system. It may not be required, but I am putting in hard points for the rudder pedal torque tubes too. Plans just say drill holes, and other fit bronze bushes in the NG-30, which mean you have to grind off the lovely powder coating on the Oelman pedals, no thanks! Figure I have some 1.2" plastic pipe in the shed, will make a foam cutter from that.

Prepared NG-1 for remaining wrap
' style=

Trimming NG-30

Trimming NG-30

' style=

Marking the NG-30 hardpoints

Marking the NG-30 hardpoints

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.