KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  9-12-2015
Number of Hours:  2.30
Manual Reference:  Step 2
Brief Description:  Aligning the Canard

Set the incidence, level and alignment. Mark the sides and F-22. Remove the Canard, trim and sand. Put the Canard back on, and repeat.

Finally happy with the Al shims in place.

Marked front tab location and removed canard.

Layed up a pad of 5 x BID, tapering to 1 at the top. Wet out the glass on peel ply on the bench and stuck them on. Lekky scissors are not working well, I think I've buggered them by forgetting to clean them.

Taped the tabs and clamped on the Canard, checking incidence, level and alignment.
' style=

Getting the incidence right

Getting the incidence right

' style=

Laying up the pads

Laying up the pads

' style=

Clamped in place, tried using leftover resin to rough fill the Canard. Beastly stuff!

Clamped in place, tried using leftover resin to rough fill the Canard. Beastly stuff!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.