KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  9-10-2015
Number of Hours:  1.20
Manual Reference:  Step 1
Brief Description:  Preparing Canard locating pins

Re-arranged workshop and levelled Fuselage. I'm building in a one-car garage, so had to set the Fuselage across the shed.

Cut out the upper Longeron holes in the upper Firewall piece, fitted it to the Fuselage, clamped to the temporary Firewall, which hasn't been junked for something else, yet.

Drilled the upper Longeron doublers for the locating pins.

Cut the heads off two AN3-20A bolts and rounded the new tips.

Trouble fitting the pins, so eased the holes somewhat, made the STBD side hole too deep.
' style=

Drilling Longeron doublers

Drilling Longeron doublers

' style=

Pins sitting in place

Pins sitting in place

' style=

Firewall clamped on

Firewall clamped on

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.