KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  8-4-2015
Number of Hours:  1.20
Manual Reference:  Step 5
Brief Description:  Canard tips

Broke off jigs and cleaned bondo.

Checked elevator travel, 15 degrees TE up, 30+ degrees TE down. :) Happy with result after all the farting around and uncertainty.

Balanced Canard with Elevators fitted on wood blocks and offered up the L jigs. Feck!!! The modified L jig is of no use for holding the elevators at 0 degrees, because they have been modified to 15 degrees, and I don't know what the original template should look like. Instantly angry again and clamp an L jig sideways and wedge the TE to 0 degrees.

Spent a bit more time fiddling with canard tips. Need more foam from the attic.
' style=

Checking elevator travel

Checking elevator travel

' style=

Playing with tip

Playing with tip

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.