KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  3-29-2015
Number of Hours:  1.50
Manual Reference:  
Brief Description:  Brakes and MLG trial install

Finished profiling and prepped MLG Inner Cover and tape surrounds.

Shortened STBD brakeline to relieve strain. Still bleeding...

Installed PORT MK100 stud and nuts for trial assembly. As intended back in the installation of the MG-1/2 / MKNG there is room for one AN960-816L each side and there is no play when tightened.
' style=

Prepping surrounds

Prepping surrounds

' style=

Shortened brakeline, could still be shorter, but I've bled enough

Shortened brakeline, could still be shorter, but I've bled enough

' style=

MK100 installed PORT side

MK100 installed PORT side

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.