KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  3-27-2015
Number of Hours:  3.50
Manual Reference:  
Brief Description:  MLG Brakes

Fitted brakes and brakelines, using -3 stainless steel wrapped teflon line, and Powerflow fittings, terminating in a bulkhead fitting in the firewall.

The bulkhead fittings were a poser, the only way to get it to work was install at an angle through the bulkhead.

Turned fuselage the right way up, and put it on its wheels for the first time. Climbed inside and had a party :)

Trimmed MLG Inner Cover to fit.
' style=

Running brake lines

Running brake lines

' style=

On the wheels!!!

On the wheels!!!

' style=

Profiling edges Inner Cover. Bulkhead fittings on right

Profiling edges Inner Cover. Bulkhead fittings on right

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.