KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  3-13-2015
Number of Hours:  2.80
Manual Reference:  
Brief Description:  MLG Outer Cover flange, Inner Cover prep

Layed up flange for MLG Outer Cover with 4 x BID. Usual method, wetted out tapes on peel ply, over plastic, and transferred to the work on the peel ply.

Peel plied edges, but could not be buggered with the transitions. Bit of an experiment.

Had too much epoxy, so decided to layup the MLG Inner Covers. Used a technique I have read about after I did my last flay layup. Apply 2 x BID and peel ply, invert, then 2 x BID and peel ply the other side Did not log when I cut these out, and have forgotten, sometime in February?

Rather than using plastic have got some new 1.25" chipboard with melamine on it, and used these to weight the layup
' style=

Laying up flange

Laying up flange

' style=

Laying up Inner cover

Laying up Inner cover

' style=

Weighted for cure

Weighted for cure

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.