KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-20-2015
Number of Hours:  2.80
Manual Reference:  
Brief Description:  MLG Attach Tab layups

Applied peel ply to jig, for better bonding to inner layups. Not mentioned in plans.

Wetted out glass over peel ply, over plastic, over my cutting template for the glass. Used a small roller with a short nap to spread the resin, FAR superior results to a stippling brush. Excess squeeged away. Wetted out 5 plies at a time, then cut with lecky scissors, and transferred to strut with the peel ply.

Did outside layup for MLG Attach Tabs, 25 x UNI, 20 x BID. Peel plied and clamped.

Installed LB hinge/LB-23/24 into fuselage bottom with micro.

Finished MLG Tab drilling jig
' style=

Wetting out UNI, 5 plies at a time

Wetting out UNI, 5 plies at a time

' style=

Applying BID

Applying BID

' style=

Potting in LB hinge and LB23/24

Potting in LB hinge and LB23/24

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.