KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-15-2015
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Prep for MLG tabs and LB attach

Spent a bit of time cleaning bunches of CRAP off bench, should have used a drop cloth.

Shimmed Landing Brake level with fus bottom and bondo'd installation jigs to it.

Trimmed MLG 2nd torsional layup.

Made MLG alignment jig on side of work bench, leveled and clamped MLG strut. Made MLG Attachment Tab jigs and bondo'd on. Took a couple of goes, bondo was setting REALLY quick.
' style=

Landing Brake assembly jig

Landing Brake assembly jig

' style=

Trimming 2nd torsional layup

Trimming 2nd torsional layup

' style=

MLG attach tab jig

MLG attach tab jig

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.