KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  1-12-2015
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Brakeline conduit / LB hinge

Filled gaps with micro and layed up 2 x BID over conduit, using 3" tapes on peel ply. Micro not stiff enough port side, I can see voids, will fill later.

Finished prep on LB hinge. Assembled LB-19 to hinge and tacked to LB-23 with Al spacers in between.

Trimmed Landing Brake, removed 3/4" of foam from LE, just realising it was in the way of the hinge.

Used leftover micro to fill seatbelt outer holes and hard-shelled Landing Brake.
' style=

Micro in, making tapes.

Micro in, making tapes.

' style=

Landing Brake hinge curing

Landing Brake hinge curing

' style=

Recycling excess micro on Landing brake, then get filtly trimming LE foam.

Recycling excess micro on Landing brake, then get filtly trimming LE foam.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.