Filled gaps with micro and layed up 2 x BID over conduit, using 3" tapes on peel ply. Micro not stiff enough port side, I can see voids, will fill later.
Finished prep on LB hinge. Assembled LB-19 to hinge and tacked to LB-23 with Al spacers in between.
Trimmed Landing Brake, removed 3/4" of foam from LE, just realising it was in the way of the hinge.
Used leftover micro to fill seatbelt outer holes and hard-shelled Landing Brake.
Micro in, making tapes.
Landing Brake hinge curing
Recycling excess micro on Landing brake, then get filtly trimming LE foam.