KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  12-9-2014
Number of Hours:  3.50
Manual Reference:  
Brief Description:  1st torsional layup

First layup in quite a while. 4 x UNI @ 35 degrees and peel ply all. Had to fart around a lot to get the fibres straight, was able to follow the shape of the strut by sliding the heavy fibres longitudinally. They are straight, but the thin fibres are all over the place.

To follow the curve cut the peel ply in alternating strips.
' style=

Slapping on UNI

Slapping on UNI

' style=

Peel ply

Peel ply

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.