KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  12-9-2014
Number of Hours:  7.80
Manual Reference:  
Brief Description:  Landing Brake hardware/MG-2

Cut LB-19 and LB-23 (12" long, due to LB-19 being outboard of plans location) on triton.

Cut AL slugs for LB-23, sanded, cleaned, alodined and primed (other than mounting surface). I'm going to do this for all aluminium parts, so from no on I'll only say "prepared". 5-min to LB-23, marking centers on drilling side.

Prepared LB-18, slightly not as plans, adjusted holes to correct edge allowance, and for 1/4" hole for actuator.

Routed fus bottom for Landing Brake. Forgot plan to use travelling box and did edge with sandpaper and multi tool.

Routed hole for LB-23.

Removed foam for actuator slot, wider and shorter than plans.

Decided not to leave MG-2 with attachment pilot holes. Drilled out, reamed to 3/16" and countersunk

Cut shims for LB-24 hinge from 0.025" Al flashing.

Running out of stuff I can do without next ASS order, still shown as 'Incomplete' :(
' style=

Cleaning up 45 degree bevel for LB-23/19

Cleaning up 45 degree bevel for LB-23/19

' style=

Cutting the hinge rebate LB-19

Cutting the hinge rebate LB-19

' style=

Fus bottom prepared, cutting hinge mount for landing brake

Fus bottom prepared, cutting hinge mount for landing brake

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.