KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  6-25-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Install NACA foam

Install NACA foam, required complicated weighting with wedges to stay flat.

Foam around MLG Bulkheads micro'd on as well.

Joggle for MLG cover ignored, I'll be installing a Wayne Hicks style flush cover. Bulkheads have been upsized 1/16" to achieve this.
' style=

3/8

3/8" stuck on

' style=

On with the 1

On with the 1"

' style=

All done

All done

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.