KitLog pro

Powered By Kitlog Pro v2.0

Home of the Spodplane
' style=
Date:  6-12-2014
Number of Hours:  2.00
Manual Reference:  
Brief Description:  Preparing bottom for internal glass

Trial fit Bottom on Fuselage. Needed a bit more clearance at front and a couple of spacers adjusted to match bulkheads/sides.

Noted that the spacer over the Landing Brake is a lot closer to the rear of the brake than the full-size drawing. Review plans and note the foam is the right size, and consistent with later plan entries, but not the full size... 3" the difference. Guess it isn't rocket science.
' style=

Trial fit

Trial fit

' style=

Adjusting spacers

Adjusting spacers

' style=

Pondering on Landing Brake

Pondering on Landing Brake

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.