KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
' style=
Date:  1-30-2018
Number of Hours:  4.00
Manual Reference:  Optional
Brief Description:  Build a cover around the elevator Push Pull tube.

Today I built a cover around the elevator Push Pull tube in the baggage area. This is to prevent interferance with the tube if something came loose in the baggage area. I installed a removable inspection cover because the elevator tube has a joint at that location.
' style=

Looking down at the push pull tube cover and inspection opening .

Looking down at the push pull tube cover and inspection opening .

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.