KitLog pro

Powered By Kitlog Pro v2.0

Daves Sonex Web Site
' style=
Date:  5-17-2017
Number of Hours:  2.00
Manual Reference:  L01
Brief Description:  Drill hole in gear leg.

The drilling of the gear leg with the colbalt bit worked really well until the last 1/8 inch. That is when the bit broke off inside the hole. I tried banging on it with a wood handle and picking at it with no luck. Ill work on it again later. Very discouraging.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.