Powered By Kitlog Pro v2.0
Daves Sonex Web Site
Sonex Aerovee Tri-gear
All
1-17-2012
< Previous Log Entry
Next Log Entry >
Date:
1-17-2012
Number of Hours:
1.75
Manual Reference:
F25
Brief Description:
Clamped and drilled longeron to right side skin.
Clamped the lower right longeron to the fuselage skin. Looks pretty easy so I drilled and clecoed.
Received the replacement channel material from Sonex today to make F27-05 Left and Right vertical channel pieces for the aft fuselage.
Aft Fuselage vertical channel # 5.
Longeron clamped to aft fuselage skin.
Drilled and clecoed longeron.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Sonex Aerovee Tri-gear Home
Category
# Logs
# Hours
All
548
1483
Aft Fuselage
47
103
Aileron
17
42
Controls
9
30
Cowling
16
48
Cowling, wing tips,
16
48
Engine
36
102
Final Assembly
19
53
Flaps
10
28
Fuel System
16
33
Fwd Fuselage
89
252
Horiz Stab and Eleva
19
63
Landing Gear
26
80
Lights
11
26
Misc Hardware
3
Miscellaneous
3
None
14
16
Panel, Avionics, Wir
29
83
Polish
4
20
Turtledeck
10
29
Vert Stab and Rudder
18
52
Windscreen and Canop
12
46
Windscreen, Canopy,
12
46
Wings
112
283
Copyright © 2001-2024 Matronics. All Rights Reserved.