KitLog pro

Powered By Kitlog Pro v2.0

Sonex 1093 Construction Log
' style=
Date:  4-13-2009
Number of Hours:  2.25
Manual Reference:  W05
Brief Description:  Flaps: Attach RH Flap Hinge (clecoed)

* I had previously drilled all the hinge stock
* Now, drilled and attached hinge to RH Flap Skin with clecoes.
* Finished deburring and RH Flap is now ready to rivet.

To avoid any twist, I cleco all ribs in place before drilling hinge holes.
' style=

Ribs clecoed into position before drilling hinge pilots

Ribs clecoed into position before drilling hinge pilots

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.