KitLog pro

Powered By Kitlog Pro v2.0

Sonex 1093 Construction Log
' style=
Date:  2-10-2009
Number of Hours:  5.25
Manual Reference:  W03-03
Brief Description:  Ailerons: Work on 2nd Counterbalance Assembly

The second Counterbalance Assembly went much smoother. I clamped and drilled the lead weight first, then attached the ribs. Much easier to line things up. At the end of this session, the 2nd CB Assembly was ready to rivet and bolt. Deburring was done.
' style=

A much better way to go

A much better way to go

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.