Sonex 1093 Construction Log
' style=
Date:  2-8-2009
Number of Hours:  0.75
Manual Reference:  W03
Brief Description:  Ailerons: Work on Counterbalance Assembly #1

My advice is, follow the plans advice and start by clamping the lead counterbalance between the plates to line things up before drilling. I did this first one backwards. It came out OK, but was a lot harder to get things squared up. I ended up clamping the lead weight in place everything eventually fell into place.
' style=

Drilling first plate to rib

Drilling first plate to rib

' style=

One side drilled and clecoed

One side drilled and clecoed

' style=

Trying to line up second side for drilling

Trying to line up second side for drilling