KitLog pro

Powered By Kitlog Pro v2.0

Sonex 1093 Construction Log
' style=
Date:  1-14-2009
Number of Hours:  4.00
Manual Reference:  T02-02
Brief Description:  Horizontal Stabilizer Assembly (Frame)

1.0 hrs. Papered over workshop table and laid out pencil lines for assembly of Horizontal Stabilizer frame.
3.0 hrs. Craig Ritson came over and we assembled the HS frame (drilled #40 pilot holes and clecoed ribs in place except for tip ribs. Flanges on both ends need to be adjusted to position tip ribs properly.

TIP: It's extremely important to position the spars exactly and clamp or cleco them down to the table.
' style=

Laying out lines on paper

Laying out lines on paper

' style=

Note Craig's scuba diving

Note Craig's scuba diving "bean bags" for holding ribs in place for drilling

' style=

What two can do in a couple of hours!

What two can do in a couple of hours!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.