11/22/08 1.5 hrs. Clecoed frame together and updrilled to #30 holes. 11/23/08 2.0 hrs. Drilled #40 pilot holes in left side of frame using pre-drilled skin as a guide. 11/27/08 1.0 hrs. Updrilled holes on left side to #30 with Eric Stoddard helping. 11/29/08 1.0 hrs. Deburred all rivet holes on left side of frame. 11/30/08 1.5 hrs. Riveted left side skin to frame (Eric, Amy and Lise all contributed).